Plan a gas-heating and evaporative-cooling changeover around room coverage, new ductwork, electrical needs, removal and repairs, with clear trade responsibilities.

Lightning Energy TeamLightning Energy24 October 2026 · 4 min read
Replacing Gas Ducted Heating and Evaporative Cooling with Reverse-Cycle

Replacing gas ducted heating and evaporative cooling with reverse-cycle air conditioning is a whole-system changeover. Review the rooms, ducts, outlets and services before deciding which existing components can remain.

The new equipment can provide heating and cooling, but it does not automatically connect to either old duct network or remove every gas charge from the household.

Map both existing systems and the rooms they serve

Record which outlets belong to gas heating and which belong to evaporative cooling. Mark rooms that were too hot, too cold or not served at all.

Ask the air conditioning designer to assess the new heating and cooling requirements together. A comfortable old winter arrangement does not prove adequate summer distribution.

YourHome distinguishes evaporative cooling, which introduces air cooled through evaporation, from reverse-cycle systems that use a refrigeration cycle to transfer heat.

YourHome heating and cooling guide.

For an illustrative home with floor heating outlets and ceiling cooling outlets, the designer must decide the suitable new route and outlet locations. Reusing whichever opening is closest is not a design method.

Identify two different existing systems. Gas ducted heating: Record winter room coverage and existing return air.; Evaporative cooling: Identify the cooler, ducts and summer outlets.; New room brief: List the heating and cooling needs the replacement must meet.
Existing outlet positions do not automatically define a suitable new layout.

Allow for new ducts and an appropriate return

Changing gas ducted heating to reverse-cycle requires a fresh assessment of the ducts and return path. Ask the contractor to specify which parts must be replaced to meet the new equipment’s airflow, insulation and pressure requirements.

YourHome heating and cooling guidance.

Ask the quote to show new routes, insulation, outlets, return air and access provisions. Limited subfloor clearance may make a ceiling route or another system arrangement more practical.

Do not assume evaporative ducts are a ready-made alternative. Their suitability for a different equipment and airflow arrangement needs assessment rather than a general promise of reuse.

Compare ducted packages only after these building constraints are understood. Separate necessary replacement work from cosmetic repairs to old openings.

If any existing components are proposed for retention, ask for their exact identity and the technical basis for keeping them within the completed design.

Design the replacement air path. Assess the equipment: Establish heating, cooling and airflow requirements.; Plan ducts and outlets: Allow for suitable dimensions, insulation and access.; Confirm return air: Design the path back from the served rooms.
SV advises new ductwork for gas-to-ducted-reverse-cycle changeovers.

Coordinate electrical work, gas work and removal

Confirm the selected equipment’s supply requirements and the household’s combined demand. The electrical capacity guide separates a new circuit from broader supply work.

Identify the qualified trades responsible for gas decommissioning, refrigeration and electrical work. Ask who removes old equipment and ducts, disposes of waste and makes the abandoned services safe.

Roof sealing after evaporative-cooler removal deserves an explicit scope, along with ceiling or floor repairs and painting. “Removal included” may not describe all of those outcomes.

Check whether a VEU offer requires particular decommissioning and evidence. Confirm the provider arrangement before work rather than treating the discount as automatic.

Victorian heating and cooling discounts.

Name the removal responsibilities. Services: Coordinate electrical work and safe gas decommissioning.; Old equipment: Specify removal, disposal and any retained components.; Building repairs: Agree roof sealing, patching and painting.
Programme decommissioning and cosmetic making good are separate scope items.

Decide whether both old systems should go now

A working evaporative cooler may still meet some summer preferences, but keeping it adds another appliance to maintain and leaves its roof and outlet arrangements to manage.

Ask for the cost and practical consequences of retaining it versus removing it. Avoid running both systems together under an improvised strategy; their intended airflow arrangements differ.

Replacing the gas heater does not remove the gas account’s daily supply charge while other gas appliances and the connection remain. Plan the final gas exit separately if that is your objective.

At handover, learn the reverse-cycle system’s normal heating, cooling, zoning and winter defrost behaviour. It will not necessarily feel or operate exactly like the old heater.

Do not force an all-at-once project if it creates an unsuitable design or unaffordable scope. A staged plan can work when retained equipment, responsibilities and future removal are clearly documented.

Keep or remove the evaporative cooler. Summer preference: Consider the comfort the working cooler still provides.; Ongoing care: Allow for another appliance and its maintenance.; Future works: Consider roof openings, outlets and later removal costs.
Removing the gas heater alone does not end charges for a retained gas connection.

Bring a marked floor plan and photos of both existing systems when you request a changeover assessment. The quote should describe the complete finished home, including what is removed and what remains.

Available times

Ready to talk about your own home?

Book a consultation and we'll map solar, storage, hot water, and the rebates around your bills and your goals.